SARAS ennovations

Your Digital Assistant

User Tools

Site Tools


erp-manual:cloud:production:joborder:ordertasks

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
erp-manual:cloud:production:joborder:ordertasks [2022/11/25 05:26]
Varun Nagrecha
erp-manual:cloud:production:joborder:ordertasks [2024/04/29 06:02] (current)
Varun Nagrecha
Line 1: Line 1:
 +
 =====Order Tasks===== =====Order Tasks=====
  
 ====Overview==== ====Overview====
  
-Tasks are used to manage the list of processes for the Job Order. For every process a task is created, which contains all the details regarding the process like the worker to whom the process is assigned to, the materials used in the process, the output of the process etc. +  * Tasks are used to manage the list of processes for the Job Order.  
 +  * For every process a task is created, which contains all the details regarding the process like the worker to whom the process is assigned to, the materials used in the process, the output of the process etc. 
  
 ====Add Tasks==== ====Add Tasks====
  
-To add tasks, click on the plus button in the task section. The Task popup is opened.+  * Click on the plus button in the task section. The Task popup is opened.
  
- {{ erp-manual:cloud:production:tasksadd.png?500 }}+ {{popup>erp-manual:cloud:production:tasksadd.png?400}}
  
-The Design ID and Design Name of the order are displayed. \\ +  * The Design ID and Design Name of the order are displayed.  
-//Select BOM//: The default BOM of the Job Order is automatically selected. \\+  //Select BOM//: The default BOM of the Job Order is automatically selected. 
 To add tasks from BOM click on the Generate BOM Tasks action button. The BOM tasks are added in the Process Plan section. To add tasks from BOM click on the Generate BOM Tasks action button. The BOM tasks are added in the Process Plan section.
   * //Process//: The name of the Process is displayed.   * //Process//: The name of the Process is displayed.
Line 33: Line 35:
 The list of tasks added for the Job Order are displayed in the Order Tasks section. The list of tasks added for the Job Order are displayed in the Order Tasks section.
  
- {{ erp-manual:cloud:production:taskslist.png?200 }}+ {{popup>erp-manual:cloud:production:taskslist.png?200}}
  
 The Tasks list shows some basic details about the tasks. A task entry is shown below. The Tasks list shows some basic details about the tasks. A task entry is shown below.
  
- {{ erp-manual:cloud:production:tasksentry.png?300 }}+ {{popup>erp-manual:cloud:production:tasksentry.png?300}}
  
-  //Task Name//: The name of the task is shown at the top left in blue color. In this example, the task name is Setting. +  //Task Name//: The name of the task is shown at the top left in blue color. In this example, the task name is Setting. 
-  //Task Status//: The status of the task shown on the right of the Task Name. +  //Task Status//: The status of the task shown on the right of the Task Name. 
-  //Qty//: The quantity of the task is shown. +  //Qty//: The quantity of the task is shown. 
-  //On//: The Start Date and End Date of the task are shown. +  //On//: The Start Date and End Date of the task are shown. 
-  //Est//: The Estimated time for the task is shown. +  //Est//: The Estimated time for the task is shown. 
-  //Act//: The Actual time taken to complete the task is shown. +  //Act//: The Actual time taken to complete the task is shown. 
-  //Worker name//: The name of the Worker assigned to the task is shown at the bottom. +  //Worker name//: The name of the Worker assigned to the task is shown at the bottom. 
-  //Progress//: The progress of the task is shown at the bottom right corner.+  //Progress//: The progress of the task is shown at the bottom right corner.
  
 ====Task Manager==== ====Task Manager====
Line 52: Line 54:
 By clicking on a task from the Order Tasks list, the details of that task are displayed in the Task section on the right of the Order Tasks list. By clicking on a task from the Order Tasks list, the details of that task are displayed in the Task section on the right of the Order Tasks list.
  
- {{ erp-manual:cloud:production:tasksdataedit.png?700 }}+ {{popup>erp-manual:cloud:production:tasksdataedit.png?700}}
  
 At the top of the Task detail section, the Name of the Task is displayed along with the status of the task. \\ At the top of the Task detail section, the Name of the Task is displayed along with the status of the task. \\
erp-manual/cloud/production/joborder/ordertasks.1669353967.txt.gz · Last modified: 2022/11/25 05:26 by Varun Nagrecha