This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
erp-manual:cloud:production:joborder:ordertasks [2022/11/25 05:15] Varun Nagrecha |
erp-manual:cloud:production:joborder:ordertasks [2024/04/29 06:02] (current) Varun Nagrecha |
||
---|---|---|---|
Line 1: | Line 1: | ||
+ | |||
=====Order Tasks===== | =====Order Tasks===== | ||
====Overview==== | ====Overview==== | ||
- | Tasks are used to manage the list of processes for the Job Order. For every process a task is created, which contains all the details regarding the process like the worker to whom the process is assigned to, the materials used in the process, the output of the process etc. | + | * Tasks are used to manage the list of processes for the Job Order. |
+ | * For every process a task is created, which contains all the details regarding the process like the worker to whom the process is assigned to, the materials used in the process, the output of the process etc. | ||
====Add Tasks==== | ====Add Tasks==== | ||
- | To add tasks, click on the plus button in the task section. The Task popup is opened. | + | * Click on the plus button in the task section. The Task popup is opened. |
- | {{ erp-manual: | + | {{popup>erp-manual: |
- | The Design ID and Design Name of the order are displayed. | + | * The Design ID and Design Name of the order are displayed. |
- | //Select BOM//: The default BOM of the Job Order is automatically selected. | + | |
To add tasks from BOM click on the Generate BOM Tasks action button. The BOM tasks are added in the Process Plan section. | To add tasks from BOM click on the Generate BOM Tasks action button. The BOM tasks are added in the Process Plan section. | ||
* // | * // | ||
Line 33: | Line 35: | ||
The list of tasks added for the Job Order are displayed in the Order Tasks section. | The list of tasks added for the Job Order are displayed in the Order Tasks section. | ||
- | {{ erp-manual: | + | {{popup>erp-manual: |
The Tasks list shows some basic details about the tasks. A task entry is shown below. | The Tasks list shows some basic details about the tasks. A task entry is shown below. | ||
- | {{ erp-manual: | + | {{popup>erp-manual: |
- | | + | |
- | | + | |
- | | + | |
- | | + | |
- | | + | |
- | | + | |
- | | + | |
- | | + | |
====Task Manager==== | ====Task Manager==== | ||
Line 52: | Line 54: | ||
By clicking on a task from the Order Tasks list, the details of that task are displayed in the Task section on the right of the Order Tasks list. | By clicking on a task from the Order Tasks list, the details of that task are displayed in the Task section on the right of the Order Tasks list. | ||
- | {{ erp-manual: | + | {{popup>erp-manual: |
At the top of the Task detail section, the Name of the Task is displayed along with the status of the task. \\ | At the top of the Task detail section, the Name of the Task is displayed along with the status of the task. \\ | ||
Line 73: | Line 75: | ||
* //Create SO//: Click on this button to generate request for creating Service Order. The request is sent to [[erp-manual: | * //Create SO//: Click on this button to generate request for creating Service Order. The request is sent to [[erp-manual: | ||
* //Service Order//: After the service order is created, the Service Order ID is displayed in this field. | * //Service Order//: After the service order is created, the Service Order ID is displayed in this field. | ||
+ | |||
* //Qty//: The quantity of the material consumed. | * //Qty//: The quantity of the material consumed. | ||
* //Issued On//: The date and time of material issue. | * //Issued On//: The date and time of material issue. |