SARAS ennovations

Your Digital Assistant

User Tools

Site Tools


erp-manual:cloud:production:joborder:expectedoutput

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
erp-manual:cloud:production:joborder:expectedoutput [2024/04/09 09:38]
Varun Nagrecha
erp-manual:cloud:production:joborder:expectedoutput [2024/04/29 05:35] (current)
Varun Nagrecha
Line 17: Line 17:
   * **Multiple Item**: The expected output can be added from Output Plan. You can add individuals materials using the Add Material action button. On selecting the item to add, the Item Editor popup is opened.     * **Multiple Item**: The expected output can be added from Output Plan. You can add individuals materials using the Add Material action button. On selecting the item to add, the Item Editor popup is opened.  
  
- {{ erp-manual:cloud:production:addmaterialitemeditor.png?400 }}+ {{popup>erp-manual:cloud:production:addmaterialitemeditor.png?400}}
  
 You can add the Required Quantity, Item Unit Cost, Labor Unit Cost, Overhead Unit Cost in the Item Editor screen. You can add the Required Quantity, Item Unit Cost, Labor Unit Cost, Overhead Unit Cost in the Item Editor screen.
erp-manual/cloud/production/joborder/expectedoutput.1712655514.txt.gz · Last modified: 2024/04/09 09:38 by Varun Nagrecha