This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | |||
erp-manual:cloud:production:joborder:expectedoutput [2024/04/09 09:38] Varun Nagrecha |
erp-manual:cloud:production:joborder:expectedoutput [2024/04/29 05:35] (current) Varun Nagrecha |
||
---|---|---|---|
Line 17: | Line 17: | ||
* **Multiple Item**: The expected output can be added from Output Plan. You can add individuals materials using the Add Material action button. On selecting the item to add, the Item Editor popup is opened. | * **Multiple Item**: The expected output can be added from Output Plan. You can add individuals materials using the Add Material action button. On selecting the item to add, the Item Editor popup is opened. | ||
- | {{ erp-manual: | + | {{popup>erp-manual: |
You can add the Required Quantity, Item Unit Cost, Labor Unit Cost, Overhead Unit Cost in the Item Editor screen. | You can add the Required Quantity, Item Unit Cost, Labor Unit Cost, Overhead Unit Cost in the Item Editor screen. |