SARAS ennovations

Your Digital Assistant

User Tools

Site Tools


erp-manual:cloud:production:joborder:costcard

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
erp-manual:cloud:production:joborder:costcard [2022/11/19 10:34]
Varun Nagrecha
erp-manual:cloud:production:joborder:costcard [2024/04/29 06:07] (current)
Varun Nagrecha
Line 5: Line 5:
 Cost Card displays all the costs incurred in the processing of the Job Order. You can view the cost card by clicking on the Cost tab in Job Order Screen. When you go to the Cost tab, the cost of that Order is refreshed automatically and displayed in the cost card. You can use the Recalculate Cost button to calculate the cost.  \\ Cost Card displays all the costs incurred in the processing of the Job Order. You can view the cost card by clicking on the Cost tab in Job Order Screen. When you go to the Cost tab, the cost of that Order is refreshed automatically and displayed in the cost card. You can use the Recalculate Cost button to calculate the cost.  \\
  
-There are different categories of costs in a Job Order. These costs are listed below - +There are different categories of costs in a Job Order. These categories are listed below - 
  
   * Material Cost(M): Cost of the materials used in the Job Order.   * Material Cost(M): Cost of the materials used in the Job Order.
-  * Labor Cost(L): The  +  * Labor Cost(L): The process cost based on the no. of hours worked. 
-  * Outsourced(S): +  * Outsourced(S): The process cost for an outsourced task.
   * Overhead Cost(O):    * Overhead Cost(O): 
-  * Non-Issue Returns(R):  +  * Non-Issue Returns(R): The cost of materials that return without being issued. 
-  * Wastage(A): +  * Wastage(A): The cost of materials wasted during a task.
  
 ====Recalculate Cost==== ====Recalculate Cost====
  
-You can recalculate the cost by clicking on the Recalculate cost button. You can recalculate cost from Tasks section or from the Job Order header. \\ +  * You can recalculate the cost by clicking on the Recalculate cost button. You can recalculate cost from Tasks section or from the Job Order header.  
-On clicking the Recalculate Cost button, a popup is opened.+  On clicking the Recalculate Cost button, a popup is opened.
  
- {{ erp-manual:cloud:production:joborderrecalculatecost.png?400 }}+ {{popup>erp-manual:cloud:production:joborderrecalculatecost.png?300}}
  
-  * YesProceed: Click on this button to Recalculate cost. +  * After the information that is required is keyed inclick on the Confirm button to close the popup.
-  * Cancel Action: Click on the Cancel button to cancel cost Recalculation.+
  
 ====Cost Card View==== ====Cost Card View====
Line 28: Line 27:
 You can view the Cost Card in the Cost tab. In the cost card, the data is displayed according to the cost categories. Only those categories are displayed which have any data. For example, the Wastage cost category will be displayed when there is material wastage in the Job Order. \\ You can view the Cost Card in the Cost tab. In the cost card, the data is displayed according to the cost categories. Only those categories are displayed which have any data. For example, the Wastage cost category will be displayed when there is material wastage in the Job Order. \\
  
-The columns displayed in the cost card are -  +Cost card shows the Type of costthe Id of material, The Description of the cost entry, Consumption, Unit Cost and Total cost for each entry\\ 
-  * Type: Shows the cost category. +At the end of each cost category, the total for that category is shown\\  
-  * ID: Shows the Id of the material.  + 
-  * Description: Gives details about the cost. +And at the bottom the total for the Job Order is shown.  
-  * Consumption: Shows the consumption of materials. For laboroutsourced and overhead Consumption shows the total hours consumed for that task+the total section shows the completed quantity of the order, the Total Cost of the Job Order without reserve cost, the Reserve Cost for the Job Order and the Total Cost of the Job Order including Reserve. 
-  * Unit Cost: Shows the Unit Cost of the data+ 
-  * Total: Shows the total cost for that entry.+
  
  
erp-manual/cloud/production/joborder/costcard.1668854063.txt.gz · Last modified: 2022/11/19 10:34 by Varun Nagrecha