This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
erp-manual:cloud:production:process [2022/11/29 11:28] Varun Nagrecha |
erp-manual:cloud:production:process [2024/04/29 06:09] (current) Varun Nagrecha |
||
---|---|---|---|
Line 4: | Line 4: | ||
In the Process Master screen you can add details about the process like the type of process, process name, add costing details etc. | In the Process Master screen you can add details about the process like the type of process, process name, add costing details etc. | ||
+ | |||
+ | ===== Start ===== | ||
+ | * Click on Process Master Menu and then click on Create New button | ||
+ | |||
+ | ===== Components of Process Master ===== | ||
+ | * Process Header | ||
+ | * Process Costing | ||
+ | |||
+ | |||
====Process Header==== | ====Process Header==== | ||
Line 9: | Line 18: | ||
The Process Header shows the details of the process like the Process Id, Type of process, Process Name, Worker Category etc. | The Process Header shows the details of the process like the Process Id, Type of process, Process Name, Worker Category etc. | ||
- | {{ erp-manual: | + | {{popup>erp-manual: |
- | To edit the Process Header, click the Edit Header action button. A popup is opened. | + | **Step 1**: To edit the Process Header, click the Edit Header action button. A popup is opened. |
- | {{ erp-manual: | + | {{popup>erp-manual: |
- | * //Process ID//: The Id of the Process is generated automatically. | + | * **Process ID**: The Id of the Process is generated automatically. |
- | * //Type//: Select the Process Type from the dropdown list. | + | * **Type**: Select the Process Type from the dropdown list. |
- | * //Worker Category//: Select the Worker category applicable for the process from the dropdown list. | + | * **Worker Category**: Select the Worker category applicable for the process from the dropdown list. |
- | * //Process Name//: Set the name of the process. | + | * **Process Name**: Set the name of the process. |
- | * //Process Code//: Give a process code for the process, if required. | + | * **Process Code**: Give a process code for the process, if required. |
- | * //Nick Name//: Give a Nickname for the process, if required. | + | * **Nick Name**: Give a Nickname for the process, if required. |
- | * //Require Mat//: Set the switch button on, if the process requires materials. | + | * **Require Mat**: Set the switch button on, if the process requires materials. |
- | * //Ref No//: Set the reference no, if necessary. | + | * **Ref No**: Set the reference no, if necessary. |
- | * //Is Inhouse//: Set if the process is an Inhouse process or not. | + | * **Is Inhouse**: Set if the process is an Inhouse process or not. |
- | * //Active//: Set the process as Active by setting the switch button on. | + | * **Active**: Set the process as Active by setting the switch button on. |
- | * //Remark//: Add remarks, if necessary. | + | * **Remark**: Add remarks, if necessary. |
- | * //Confirm action//: Click on the Confirm button to confirm changes. | + | |
- | * //Cancel action//: Click on the Cancel button to cancel changes. | + | **Step 2**: After the information that is required is keyed in, click on the Confirm button to close the popup. |
====Process Costing==== | ====Process Costing==== | ||
- | Process Costing shows the costing details for the process. | + | Process Costing shows the costing details for the process. |
- | To add costing for the process, click on the + button in the Process Costing section. A popup is opened. | + | |
+ | **Step 1**: To add costing for the process, click on the + button in the Process Costing section. A popup is opened. | ||
+ | |||
+ | | ||
- | {{ erp-manual:cloud:production:processcosting.png?500 }} | + | * **Price Type**: The Price Type is automatically selected as Time Based. To change the Price Type, select the type from the dropdown list. |
+ | * **Labor Cost**: Set the Unit Labor Cost for the process. | ||
+ | * **Overhead Cost**: Set the Unit Overhead Cost for the process. | ||
+ | * **Unit**: The Unit for Time Based type is set to hr. | ||
+ | * **Currency**: | ||
+ | * **Remarks**: Add Remarks, if necessary. | ||
- | | + | **Step 2**: After the information that is required is keyed in, click on the Confirm button |
- | | + | |
- | | + | |
- | * //Unit//: The Unit for Time Based type is set to hr. | + | |
- | * // | + | |
- | * // | + |