SARAS ennovations

Your Digital Assistant

User Tools

Site Tools


erp-manual:cloud:production:calendar

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
erp-manual:cloud:production:calendar [2022/11/29 05:29]
Varun Nagrecha
erp-manual:cloud:production:calendar [2024/04/18 05:26] (current)
Varun Nagrecha
Line 7: Line 7:
 ====Worker Calendar==== ====Worker Calendar====
  
-In the Calendar screen, the Branch Header section is visible. You need to select a branch to load the calendar for that branch.+**Step 1:** Load Branch Calendar 
 +  * In the Calendar screen, the Branch Header section is visible. You need to select a branch to load the calendar for that branch.
  
- {{ erp-manual:cloud:production:branchcalendarselectscreen.png?500 }}+ {{popup>erp-manual:cloud:production:branchcalendarselectscreen.png?400}}
  
-Select the required Branch from the dropdown list to view the Calendar for that branch. \\ +  * Select the required Branch from the dropdown list to view the Calendar for that branch. 
-After selecting the Branch, click on the Get Branch Details action button. The Calendar details for the selected branch are visible.+  After selecting the Branch, click on the Get Branch Details action button. The Calendar details for the selected branch are visible.
  
- {{ erp-manual:cloud:production:branchcalendarcreateyearly.png?500 }}+**Step 2:** Load/Create Yearly Calendar 
 +  * If the Calendar is not created for the branch, you will see the Yearly section blank and the Create Yearly button is visible. To create a calendar, click on the Create Yearly action button. The calendar gets created. 
 +  * To load the calendar, click on the Load Calendar action button. The calendar for the present month will be displayed.
  
-If the Calendar is not created for the branch, you will see the Yearly section blank and the Create Yearly button is visible. To create a calendar, click on the Create Yearly action button. The calendar gets created.\\ + {{popup>erp-manual:cloud:production:branchcalendarcreateyearly.png?500}}
-To load the calendar, click on the Load Calendar action button. The calendar for the present month will be displayed.+
  
- {{ erp-manual:cloud:production:branchcalenderfullscreen.png?500 }}+  * To load the calendar for a different month, select the required Year and Month besides the Load Calendar button. After selecting the month and year, click on Load Calendar to load the calendar for the selected month.
  
-To load the calendar for a different month, select the required Year and Month besides the Load Calendar button. After selecting the month and year, click on Load Calendar to load the calendar for the selected month.+{{popup>erp-manual:cloud:production:branchcalenderfullscreen.png?500}}
  
-In the Setup Overtime/Leave section, you can set the leaves by workers and overtimes done by the workers.\\+**Step 3:** Add Overtime or Leave. In the Setup Overtime/Leave section, you can set the leaves by workers and overtimes done by the workers.
   * //From Date//: Select when the Leave/Overtime starts using the date picker.   * //From Date//: Select when the Leave/Overtime starts using the date picker.
   * //To Date//: Select when the Leave/Overtime ends using the date picker.   * //To Date//: Select when the Leave/Overtime ends using the date picker.
Line 39: Line 41:
     * //Remove Leave//: Click on this button to remove the leave.     * //Remove Leave//: Click on this button to remove the leave.
  
-To add holidays to the calendar, click on the Holidays tab.+**Step 4:** Add Holidays. To add holidays to the calendar, click on the Holidays tab.
  
- {{ erp-manual:cloud:production:branchcalendarholiday.png?700 }}+ {{popup>erp-manual:cloud:production:branchcalendarholiday.png?700}}
  
-The list of holidays for the calendar can be seen. To add new holiday, click on the Add Holiday action button. A popup is opened. +  * The list of holidays for the calendar can be seen. To add new holiday, click on the Add Holiday action button. A popup is opened. 
  
- {{ erp-manual:cloud:production:branchcalendaraddholiday.png?300 }}+ {{popup>erp-manual:cloud:production:branchcalendaraddholiday.png?300}}
  
-  * //Holiday On//: Select date for holiday using the date picker. +  * //Holiday On//: Select date for holiday using the date picker. //Holiday Info//: Add some information about the holiday, if necessary. 
-  * //Holiday Info//: Add some information about the holiday, if necessary. +  * Click on Confirm to close popup
-  * //Confirm Action//: Click on the Confirm button to confirm changes+  * To edit an existing holiday click on the Edit button in the Action field. The same popup is opened that was opened for creating holidays. You can repeat the above steps to edit the holiday details.
-  * //Cancel Action//: Click on the Cancel button to cancel changes.+
  
-To edit an existing holiday click on the Edit button in the Action field. The same popup is opened that was opened for creating holidays. You can repeat the above steps to edit the holiday details.+**Step 4:** In the Weekly Calendar tab, the details for all the week days can be set like the working hours, break hours etc.
  
-In the Weekly Calendar tab, the details for all the week days can be set like the working hours, break hours etc.+ {{popup>erp-manual:cloud:production:banchcalenderweeklycalendar.png?500}}
  
- {{ erp-manual:cloud:production:banchcalenderweeklycalendar.png?500 }} +  * To edit the details of a week day, click on the Edit button in the Action tab. 
- +     * //Start Time//: Set the starting time for the branch. 
-To edit the details of a week day, click on the Edit button in the Action tab. +     * //Closing Time//: Set the closing time for the branch. 
-  * //Start Time//: Set the starting time for the branch. +     * //Total Break Hours//: Set the total break hours for the day. 
-  * //Closing Time//: Set the closing time for the branch. +     * //Working Hours//: The total working hours are displayed. 
-  * //Total Break Hours//: Set the total break hours for the day. +     * //Week Off//: Set if the day is working day or not.
-  * //Working Hours//: The total working hours are displayed. +
-  * //Week Off//: Set if the day is working day or not.+
  
  
erp-manual/cloud/production/calendar.1669699751.txt.gz · Last modified: 2022/11/29 05:29 by Varun Nagrecha