====== Create New Material Downgrade ====== ===== Overview ===== * It is same as [[erp-manual:cloud:warehouse:material-adjustment|Material Adjustment]] ===== Downgrade Rules ===== * At least one Item should be added which is negative quantity for Downgrade From * This has to be a Batch Item * At least one Item should be added which is positive quantity for Downgrade To * This can be a Master Item, or Batch Item * Specify the cost of the Item if Master is selected, so that new Batch will have the give cost * System will not Validate if the quantity of Downgrade From and Downgrade To is same or not, it is allowed to be different