SARAS ennovations

Your Digital Assistant

User Tools

Site Tools


erp-manual:cloud:production

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
erp-manual:cloud:production [2023/12/05 13:33]
Kalpesh Popat
erp-manual:cloud:production [2024/04/19 05:45] (current)
Varun Nagrecha
Line 10: Line 10:
 | [[erp-manual:cloud:quality-control:QualityControl|Production QC]]              |Quality Control for Production output              |                               | [[erp-manual:cloud:quality-control:QualityControl|Production QC]]              |Quality Control for Production output              |                              
 | [[erp-manual:cloud:production:dashboard|Worker Dashboard]]                    | Shows a dashboard of workers and their open tasks for a given category.                            |                                                   | [[erp-manual:cloud:production:dashboard|Worker Dashboard]]                    | Shows a dashboard of workers and their open tasks for a given category.                            |                                                  
-| [[erp-manual:cloud:production:fgoutput|FG Output]]                   | Finished Goods can be selected and receipt can be generated.        |                                                         +| [[erp-manual:cloud:production:fgoutput|Order Output]]                   | Finished Goods output of orders is shown in this screen.        |  
 +| [[erp-manual:cloud:production:receiveoutput|Receive Output]]                   | Generate receipt for Finished Goods.        |                                                         
 | [[erp-manual:cloud:production:calendar|Calendar]]              | Worker Calendar shows the list of working hours, holidays, leaves and overtimes for a given branch.                                                                          | | [[erp-manual:cloud:production:calendar|Calendar]]              | Worker Calendar shows the list of working hours, holidays, leaves and overtimes for a given branch.                                                                          |
 | [[erp-manual:cloud:production:process|Process Master]]     | Process Master screen                  | | [[erp-manual:cloud:production:process|Process Master]]     | Process Master screen                  |
 | [[erp-manual:cloud:quality-control:QCConfig|QC Configuration]]                                        | Configure the quality check parameters     | | [[erp-manual:cloud:quality-control:QCConfig|QC Configuration]]                                        | Configure the quality check parameters     |
 +
 +
 +
 +^ Link                         ^ Special Scenario                                                                        ^ 
 +| [[erp-manual:cloud:production:joborder:cancel-order|Cancel Order]]              | Cancel a Job Order for any reasons, either the order is no longer required, or change in the design.                                                                                                                        
 +
erp-manual/cloud/production.1701783231.txt.gz · Last modified: 2023/12/05 13:33 by Kalpesh Popat