This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
erp-manual:cloud:production:process [2022/11/28 06:42] Varun Nagrecha created |
erp-manual:cloud:production:process [2024/04/29 06:09] (current) Varun Nagrecha |
||
---|---|---|---|
Line 3: | Line 3: | ||
====Overview==== | ====Overview==== | ||
- | ====Process==== | + | In the Process Master screen you can add details about the process like the type of process, process name, add costing details etc. |
+ | |||
+ | ===== Start ===== | ||
+ | * Click on Process | ||
+ | |||
+ | ===== Components of Process Master ===== | ||
+ | * Process Header | ||
+ | * Process Costing | ||
+ | |||
+ | |||
+ | |||
+ | ====Process Header==== | ||
+ | |||
+ | The Process Header shows the details of the process like the Process Id, Type of process, Process Name, Worker Category etc. | ||
+ | |||
+ | | ||
+ | |||
+ | **Step 1**: To edit the Process Header, click the Edit Header action button. A popup is opened. | ||
+ | |||
+ | | ||
+ | |||
+ | * **Process ID**: The Id of the Process is generated automatically. | ||
+ | * **Type**: Select the Process Type from the dropdown list. | ||
+ | * **Worker Category**: Select the Worker category applicable for the process from the dropdown list. | ||
+ | * **Process Name**: Set the name of the process. | ||
+ | * **Process Code**: Give a process code for the process, if required. | ||
+ | * **Nick Name**: Give a Nickname for the process, if required. | ||
+ | * **Require Mat**: Set the switch button on, if the process requires materials. | ||
+ | * **Ref No**: Set the reference no, if necessary. | ||
+ | * **Is Inhouse**: Set if the process is an Inhouse process or not. | ||
+ | * **Active**: Set the process as Active by setting the switch button on. | ||
+ | * **Remark**: Add remarks, if necessary. | ||
+ | |||
+ | **Step 2**: After the information that is required is keyed in, click on the Confirm button to close the popup. | ||
+ | |||
+ | ====Process Costing==== | ||
+ | |||
+ | Process Costing shows the costing details for the process. | ||
+ | |||
+ | **Step 1**: To add costing for the process, click on the + button in the Process Costing section. A popup is opened. | ||
+ | |||
+ | | ||
+ | |||
+ | * **Price Type**: The Price Type is automatically selected as Time Based. To change the Price Type, select the type from the dropdown list. | ||
+ | * **Labor Cost**: Set the Unit Labor Cost for the process. | ||
+ | * **Overhead Cost**: Set the Unit Overhead Cost for the process. | ||
+ | * **Unit**: The Unit for Time Based type is set to hr. | ||
+ | * **Currency**: | ||
+ | * **Remarks**: | ||
+ | |||
+ | **Step 2**: After the information that is required is keyed in, click on the Confirm button to close the popup. |